Skip to content
Scroll

Civil, traffic and stormwater engineering, Australia

Civil, traffic and stormwater engineering for Australian developments

Method brings your project to life, from the first permit condition to the Statement of Compliance. A registered engineer leads every job and stays on it through to sign-off.

Who Method works for

Developers, builders, architects and councils

Method works with developers, builders, architects and designers, councils and landowners across Australia. The engineer who scopes a job stays on it through design, authority approvals and construction, and signs the documents that go to council.

CPEng  ·  NER  ·  RPEQ  ·  RPEV  ·  Professional indemnity insured

Approach

Settle the constraints before the layout is fixed

NotesKeyed to the photo
  1. Settle the legal point of discharge and the site access before the layout is fixed.
  2. Design to the relevant authorities' requirements.
  3. Detail it for the contractor who builds it, so the drawings answer the questions on site.
Aerial photo of a new bus interchange with its access roads, kerbs and retaining walls beside an arterial road
Bus interchange and road works

Services

The service schedule

  1. 01

    Urban development

    Civil engineering for greenfield, infill and brownfield development, from the feasibility study to the Statement of Compliance.

  2. 02

    Building projects

    The civil package for townhouses, apartments, commercial, education and health projects: earthworks, drainage, car parks, performance solutions and peer review.

  3. 03

    Civil infrastructure

    Roads, intersections, pavements and streetscapes for developments and councils, designed to the council's standard drawings and detailed for construction.

  4. 04

    Stormwater and flooding

    Stormwater management plans, WSUD reports, detention design and flood assessments that meet the council's own policy and get the permit through.

  5. 05

    Transport and traffic

    Traffic impact assessments, parking and swept path analysis, and access layouts that get planning permits through council.

How an engagement runs

From enquiry to close-out in seven steps

  1. Enquiry Client provides the site address and the permit conditions.
  2. Fee proposal Fee proposal by the agreed date.
  3. Project commencement Commencement of design, confirm programs.
  4. Design Drawings, reports and models to the council’s requirements.
  5. Authority approvals Submissions and responses with the relevant authorities.
  6. Construction phase Contractor queries, inspections and as-constructed review.
  7. Close-out Project completion. Onto the next one.

The filled ring is the commencement fee, the one payment before design starts. Not always required, but it may be needed early for authority submissions such as the legal point of discharge.

Not sure what the conditions are asking for? Send them over. Method will tell you what they mean and what it would take, no obligation.

Start the conversation